Maritime
Modular floating dock: NIMASA hands over site to technical partners
The Management of the Nigerian Maritime Administration and Safety Agency, NIMASA has handed over the leased site at the Continental Shipyard Limited (CSL) of the Nigerian Ports Authority to the technical partners, Melsmore. The technical partners are to liaise with the Management of the Nigerian Ports Authority in finalising site management, which include risk assessment in preparation to move the Modular floating Dock to the Continental Shipyard for the commencement of full operations. NIMASA and the technical partners also agreed to invite manufacturers of the Floating Dock, Damen Shipyard to join in recommissioning the Dockyard, while site preparations are ongoing. This is to ensure the Floating Dock is deployed in the shortest possible time.

While addressing officials of Melsmore, the Director General of NIMASA, Dr. Bashir Jamoh, OFR, emphasised the need for them to review the action plan in the light of realities on ground with detailed deliverables, and key performance indicators with clearly stated timelines.

“Nigerians eagerly await the deployment of the Modular Floating Dock. This is a national asset, which has potentials to boost maritime trade, create jobs, develop skills, by providing training avenues to various maritime training institutions in Nigeria, while also attracting foreign investment and preventing capital flight, thereby generating revenue. We hope to have students from the Maritime Academy of Nigeria and the Maritime University Okerenkoko amongst other maritime institutions come for practical time”, the DG said.
In his remarks, the Managing Director, Melsmore, Mr. Danny Fuchs thanked the Management of the Agency for the opportunity to work on such important project, and gave the assurance that the company is prepared to handle the movement of the floating dock from the naval dockyard to the Continental Shipyard Limited (CSL). It may be recalled that the Nigerian Ports Authority (NPA) recently leased designated areas at the Continental Shipyard for the operations of the Modular Floating Dock. The areas include; the dolphin jetty, waterfront of the jetty adjourning the slipway, an administrative block, a construction, welding and mechanical workshop and a civil maintenance workshop, among others. The project will be run on a Public Private Partnership (PPP) arrangement.
-
Economy2 days agoNigeria Sovereign Investment Authority announces winners of $275,000 prize for innovation
-
Finance2 days agoAirtel Money reports 25% growth in first-half revenue in maiden results
-
Oil and Gas2 days agoHoneywell Technologies launches new AI platform at Dangote’s Nigeria refinery
-
Economy2 days agoFG targets single-digit inflation by end-2027 to unlock cheaper borrowing— Oyedele
-
News2 days agoEFCC arrests 14 Chinese nationals in Nigeria for operating illegal lithium processing plants
-
Maritime2 days agoNIMASA, ITF signs MOU on Seafarer wellbeing, MoU First in Africa—ITF
-
News19 hours agoNigeria panel says 37 detained miners died from overcrowding and neglect
-
Finance19 hours agoUBA seeks jail term for WEMPCO directors, intensifies N61bn loan recovery drive
