News
Nigeria’s oil export terminal shut for maintenance
Nigeria’s Bonga crude oil export terminal has begun routine maintenance, its operator Shell told Reuters on Tuesday, adding it aimed to have the work done in “record time”. The Shell Nigeria Exploration and Production Company (SNEPCo) said in an email that maintenance on the Bonga floating production storage and offloading unit (FPSO) began on May 21.
“The scope includes statutory recertification and critical asset integrity activities and will run until July during which there will be a few days of total shutdown,” SNEPCo said. SNEPCo said it was working to complete the maintenance “safely and in record time” after a source at the port earlier told Reuters that the FPSO would be closed for two weeks. Bonga was scheduled to load four cargoes in June, or 127,000 barrels per day (bpd), up slightly from May at 123,000 bpd.
-
Agriculture21 hours agoOver 2.5m metric tonnes of food valued N2trn produced in 2yrs—FG
-
News21 hours agoCourt orders British Govt. to pay £420m to 21 coal miners killed by colonial masters
-
Maritime21 hours agoNIMASA mulls expansion of deep blue project, calls for continued partnership with Navy
-
Economy21 hours agoBPE, stakeholders unite to rollout $500m free meters, DisCos pledge to lead drive
-
Finance21 hours agoCBN cuts 1-Year Treasury Bill rate, rejects Bids
-
Business21 hours agoMTN to acquire controlling stake in IHS Holdings, eyes full ownership
-
Oil and Gas21 hours agoDangote refinery backs gantry loading, cautions against costly coastal evacuation
-
News21 hours agoRaham Bello, others launch N20bn endowment fund for alma mater
